Finding development and infill opportunities
Nairobi's 2026 zoning allows far more floor area in many neighbourhoods than stands there today. Most of that reserve will never be used, because rents do not cover the cost. urbase separates the reserve that could pay from the reserve that only exists on paper.
The problem with raw capacity
A plot with a high allowed plot ratio looks attractive until rents, build costs and the value of the existing building are counted. Developers spend time on sites that cannot work and miss the ones that can, because nobody has put zoning, rents and costs side by side for every plot.
How urbase screens
For each building urbase compares the floor area allowed by zoning, capped at a plot ratio of 4.0, with what is built today. It leaves out informal areas, plots below 150 square metres, river reserves and public or religious buildings. For the remaining reserve it checks whether new floor area would pay at a cautious and a favourable published yield.
What you get
For a neighbourhood the number of buildings with unused allowed floor area, how many of them could pay, the total reserve and the largest single opportunities on the map. For a single building, how many storeys could be added.
Where the limits are
urbase does not check structure, title, approvals or existing tenants. It narrows a city down to the places worth a feasibility study.
Questions
- Why cap at a plot ratio of 4.0?
- Higher ratios exist on paper in a few zones but are rarely achieved outside the centre. The cap keeps the screening realistic.
- What counts as 'could pay'?
- The residual value of the new floor area at the given yield exceeds the modelled land value.
- Does this cover the whole city?
- Yes, every mapped building in the model is screened.
urbase is open to invited users. Sign in to run this for your own locations, or ask us for access.
Run urbase